This week's blog post is an extract of the Irish Property Buyers Handbook 2015, by Carol Tallon, dealing with the structural survey:
THE STRUCTURAL SURVEY
Why it is important and what to expect
The structural survey
is a comprehensive inspection of the property
in question,
carried out by a qualified surveyor, registered architect
or chartered
engineer at the request of the potential home-buyer. It
should not be
confused with the lender’s survey, which in reality is
merely an
independent valuation report. The purpose of the
structural survey
is to give the purchaser an unbiased evaluation of
the overall
condition of a property, and to highlight any aspects that
may need upgrading,
repair, replacement or ongoing maintenance.
Crucially, the
report arising from the structural survey will provide
the buyer with the
information needed to make an informed decision
on whether to go
ahead with purchasing the property.
Unlike the bank
survey, which is mandatory, a structural survey is
optional, although
any property professional would advise that the
buyer undertake one
before making the single, biggest investment of
their life.
Undertaking this due diligence and attaining the
knowledge of
defects or issues needing attention may discourage
buyers from
proceeding with the purchase outright, or may help to
plan for work that
is likely to be necessary in the short and medium
term. Armed with
this survey, the buyer should save a significant
sum of money on
defects that the seller may now have to correct
before the sale is
agreed. Knowing the cost of even small repairs,
which can run to
thousands of euro, can be a great negotiating tool.
Aspects of the
property that are routinely checked in the course of
structural survey
are as follows:
External Areas, Internal Areas , Other
- • Roof and chimneys
- • Guttering and flashing
- Settlement cracks
- Movement in foundations
- Windows and doors
- Drainage
- Boundaries
- Path and driveway.
- Interior attic space
- Ceilings and floors
- Interior walls
- Windows and doors
- Heating system
- Plumbing and Electrics
- Working fireplaces
- Ventilation and damp
- Insulation.
- Compliance with Building Regulations
- Boundary infringements
- Boundary conditions
There are some
limitations to the survey, which may vary from one
survey to another.
Buyers will be made aware of these limitations by
the surveyor,
either in advance of the survey or within the report
document. If there
is any ambiguity, buyers are advised to seek
clarification and
not to assume anything.
The most notable
limitations tend to be as follows:
- • Roofs and chimneys in excess of three metres generally will be examined from ground level.
- • The building fabric will not be breached in the course of the inspection. The survey is strictly on the basis of what is visible or accessible.
- Plumbing and heating systems will be activated where connection permits, but will not generally be tested unless there is reason to suspect a problem.
- Sewers are inspected to the extent of lifting covers on manholes. Once again, testing will only be recommended where there is some reason to suspect something.
The age of the
building to be surveyed is a very important
consideration.
Buyers should not be fooled by a modern, well-finished
home. The age is no
guarantee of a sound structure. In fact,
many experts
maintain that the overall quality of new home
construction over
the past decade has deteriorated somewhat. Older
houses have their
own particular issues to contend with – for
example,
non-regulation windows or access – but they are generally
well-constructed.
When looking at the structural condition of the
property, the
engineer will pay particular attention to defects that are
inconsistent with
the age of the property. The engineer will issue a
full report to the
buyer, which will set out areas of the property
needing attention
and make recommendations.
Defects or areas
needing attention may cause a re-negotiation of
the purchase price.
In addition, defects that are inconsistent with the
age of the house
should flag concern. For example, if the engineer
finds a hole in the
roof of a modern, three bedroom semi-detached
house, a question
mark may arise over the quality of the property.
On that point, some
buyers in the past have chosen not to request a
structural survey
where the house in question is less than 10 years
old and covered
under the original structural defect insurance
scheme, usually
HomeBond. This is nonsense. Protection against
defects for 10
years is of little benefit if the buyer cannot identify
those defects.
It should be noted, however, that very few buildings are withoutany defects. The surveyor will furnish a lengthy report, many pageslong, that will list observations, opinions and recommendations onissues that would not necessarily be classed as defects, so buyersshould be prepared for this and not panic. When issues or possiblydefects are identified, it does not necessarily mean that it is not aquality property. The buyer must work through the surveyor’s reportand determine which issues are consistent and to be expected, whichissues are easily remedied and which issues are essentially deal-breakers.Whatever the outcome, knowing in advance is essential –forewarned is always forearmed.
Engineers’ fees may
vary, depending on the age and extent of the
property, together
with the location, or specifically, the time and
travel involved. A
survey generally will take between one to two
hours. Buyers
should expect to pay somewhere in the region of €300
to €450 plus VAT.
If the buyer is waiting to sign contracts of sale, the
engineer usually
will give a verbal assessment of the property on the
day of the survey –
the equivalent to a thumbs up or thumbs down.
The written report
generally will issue within a period of five days.
By engaging a
suitably qualified surveyor with professional
indemnity
insurance, buyers are assured that they are covered in the
event that they
suffer financial loss as a result of neglect, error or
omission in the
course of producing the structural survey.
Snag List
A snag list will be
necessary for buyers purchasing a newly-built
home. It is not a
structural survey, as discussed above, but rather a
checklist of minor
defects that the builder or developer must
complete prior to
the sale closing. The vast majority of newly-built
properties are
covered by a building guarantee or under a structural
guarantee scheme,
such as HomeBond or Premier, which protects
the occupant of the
home against specific significant defects for a
period of 10 years.
This protection applies to the property, not the
owner; therefore,
subsequent buyers will enjoy this protection for 10
years after the
completion of the building.
The snag list
consists of all the items that must be finished or
fixed by the
builder or developer before the sale is finalised. Builders
have a poor
reputation for after-sales service, so it is crucial that all
outstanding items
are dealt with before final monies are paid over. In
certain
circumstances, the sale might be allowed to proceed on the
stated agreement of
works to be carried out, but this leaves the buyer
in a vulnerable
position and is therefore not recommended. An
exception to this
might be the Irish weather causing huge delays in
finishing the
garden to specification. In this instance, the purchase
might go ahead and
close contracts subject to a small portion of the
funds being
withheld from the builder until such time as the garden
works are completed.
As with the
structural survey, a snag list is not mandatory,
although it should
definitely be regarded as essential by the new
home-owners. Snag
lists do not need to be carried out by a
professional in
order to be effective. In fact, some of the most
comprehensive lists
are carried out by the buyers, although engaging
a professional
engineer or surveyor has a number of benefits. Chiefly,
their training and
expertise suggests that they will uncover minor
faults or needed
finishing touches that the buyer might never have
noticed. Secondly,
they are likely to demand a higher quality finish
than buyers might
know to demand. Thirdly, buyers receive the
benefit of
professional indemnity insurance, as already discussed
above. If any issue
or defect is overlooked at the snagging stage, it
may cost money to
remedy it. By hiring a professional, that person is
answerable to the
buyer for any work carried out.
Buyers who have
some experience in construction or who have
purchased property
previously might feel confident about compiling
a thorough snag
list themselves. If so, there is now a wealth of
information
available through Irish and UK websites, where buyers
can read tips,
learn from other buyers and download comprehensive
DIY snagging
checklists. One good resource is www.snagging.org.
If there is reason
for concern, however, buyers should speak to a
qualified engineer.
New Technologies
It is important to
note, in the context of a survey or snaglist being
prepared, that building,
heating and electrical systems have become
very complex with
the introduction of renewable energy systems
such as heat
recovery units, ground source heat pumps and solar
panel heating to
name a few. It may be necessary to engage the
services of a
specialist to report on the conditions of such works in
addition to the
structural survey.
KEY POINTS FROM CHAPTER 17
- The structural survey is an inspection of the property in
question, carried
out by a qualified surveyor for the
potential
home-buyer.
- It is not to be confused with the lender’s survey, which is
merely an
independent valuation report.
- The purpose of the structural survey is to determine the
condition of the
property and to highlight any aspects that
may need repair,
replacement or ongoing maintenance.
- The structural survey will provide the buyer with the
information needed
to make an informed decision on
whether to go ahead
with purchasing the property.
- The buyer should be aware that older properties have
inherent structural
issues and these rarely will be
considered
deal-breakers. Buyers should be concerned
about issues that
are inconsistent with the age and price of the
property.
- Further negotiations may take place to deal with issues
arising from the report
but only if they are inconsistent with the age
and price of the
property.
- A snag list consisting of all the items that must be finished
or fixed by the
builder or developer will be necessary for
buyers purchasing a
newly-built home.